Reference design. This page describes how Greecon approaches this type of project and what we will measure. It is not a record of a delivered installation. The site, partners, and results will be published here once a project is confirmed.

The challenge

Land used for energy is often land lost for farming. Agrivoltaics lets both happen on the same field — but only if generation and crop health are managed together, and only if the design starts with the farm.

Our approach

Design around the crop. We choose the crop and the farming practice first — shade tolerance, machinery, irrigation, harvest — then set mounting height, row spacing, and orientation to serve them. See agrivoltaics: designing for the crop and the panel.

One monitoring system. Panels, inverters, and (where used) batteries connect to the Greecon Platform alongside soil sensors, a weather station, and irrigation meters, so energy output and field conditions can be read side by side.

Engineered for safety and grid compliance. Array design, inverter selection, commissioning, and documentation follow recognized standards, and the grid connection is designed with the distribution operator's requirements from the start. See sizing solar plus storage.

What we will measure

  • Electricity generated and consumed on site, and system performance ratio
  • Soil moisture and temperature under and between panels, and light reaching the crop
  • Water applied for irrigation across the season
  • Crop yield per zone against a comparison area in full sun
  • Land Equivalent Ratio (LER) — whether the combined system uses the land more productively than farming and generating separately

Phases

  1. Site and crop selection — land category, soil, water, shading, grid access, and farmer priorities.
  2. Baseline — a season of farm data before construction where possible.
  3. Design and permitting — layout, structural and electrical design, permits.
  4. Build and commission — with soil protection during construction.
  5. Monitor and learn — a full growing season of paired energy and crop data, then adjust.

Albanian law already allows agrivoltaics on farmland under conditions: Law 68/2023 permits it on bonitet 7 and 8 land while farming continues, and Council of Ministers Decision 387 (2024) sets limits on panel coverage, module height and the share of land kept in farming, plus a fee. Law 69/2026 (July 2026) added storage and asks the Council of Ministers for a new decision, which we had not found by November 2026. The pilot's site and layout must be checked against these rules and any new decision before design is fixed. See Agrivoltaics in Albania: what the law allows and what is pending and Albania's energy rules are changing in 2026. Lease terms, grid-connection conditions, and the compensation scheme for exported electricity also need to be settled before construction.

Communication

Landowners, farmers, and neighbors are part of the project from the start: what will be built, for how long, what changes for them, and how results will be reported. See talking with communities and municipalities.

Contact

Let’s build the future, sustainably.

Whether you’re a business, municipality, or investor, we’re here to help you design and implement smarter, greener systems. Reach out to explore collaboration, partnership, or project opportunities with Greecon.

Email:
info@greecon.earth
Phone:
+355 69 444 3362
Location:
Shijak, Durrës, Albania
By sector:
energy@greecon.earth · agriculture@greecon.earth · water@greecon.earth