EnergyLegal & Compliance

Is agrivoltaics allowed on farmland in Albania? What the law says

Yes, on bonitet 7 and 8 land while farming continues. Decision 387/2024 sets the criteria and fee; Law 69/2026 added storage and an update is due.

General information, as of 2 November 2026. This article summarizes public sources and is not legal advice. It rests on the texts of Law No. 68/2023, Council of Ministers Decision No. 387/2024 and Law No. 69/2026 as published on the Albanian planning portal, not on the Official Gazette originals. Press reports of the July 2026 law differ from the texts, and we say where. Confirm current rules with the Ministry of Agriculture and Rural Development and a qualified Albanian lawyer before committing to a project.

Yes, within limits. Albanian law has allowed agrivoltaics on agricultural land since 2023, but only on land of bonitet 7 and 8 and only while farming continues. Council of Ministers Decision 387 of June 2024 already sets the detailed criteria, monitoring and fee. The July 2026 amendment added storage and ordered an update, which is still pending.

What does "agrivoltaic" mean in Albanian law?

An agrivoltaic activity is farming and solar power on the same agricultural land at the same time, with farming running without interruption. Law No. 68/2023 added this definition to Law No. 9244/2004 "On the protection of agricultural land". It covers building, using, operating, trading, distributing and transmitting electricity from photovoltaic sources, combined with uninterrupted agricultural production.

The definition makes the farm the primary use. A solar plant that grows weeds under the panels does not qualify. For the engineering side of keeping a crop productive under panels, see our guide to agrivoltaics design.

Which land and soil quality are allowed?

Agrivoltaic infrastructure is allowed on agricultural land of bonitet 7 and 8, certified by the land administration directorate (DAMT). Bonitet is the soil-quality grade in the cadastral records, on a scale from 1 to 10 according to Decision 387/2024. Article 14(5) of Law 9244, added in 2023, sets the limits:

Use Soil grade Condition in the text
Agrivoltaic and self-producer infrastructure Bonitet 7 and 8, certified by DAMT Farming continues, in combination
Wind plants Bonitet up to 8 Farming continues
Solar and wind, self-producers Bonitet 9 and 10, DAMT or ownership document Farming condition not repeated in this letter
Solar on greenhouses, sheds, barns, stables Agricultural land, no grade stated Installed on existing buildings

Many reports, including Reporter.al in July 2026, say agrivoltaics and wind are allowed "up to bonitet 8". That is a simplification. In the law text, "up to 8" is tied to wind, while agrivoltaics is set at 7 and 8. Reporter.al describes land up to bonitet 8 as low in fertility. The text does not explain how the scale is read for grades 9 and 10, so ask DAMT how your parcel is graded.

What conditions does Decision 387/2024 set?

Decision 387 of 12 June 2024 sets layout, light, output and reversibility conditions for agrivoltaics on bonitet 7 and 8 land. The Council of Ministers issued it under the 2023 law. A 2025 Ministry of Agriculture impact assessment still lists it among the acts in force under the law. The main criteria:

Criterion Requirement
Farming Continuous every year, per an approved business plan
Land kept for farming At least 60% of the parcel
Energy-producing module surface At most 40% of the parcel
Light reaching crops At least 60%
Module height At least 3 m
Spacing At least 4 m between modules along the tillage direction and 4 m between rows; at least 7 m between rows for vertical modules
Farm output At least 70% of the pre-installation or reference yield (three-year municipal average)
Mounting Removable, without materials that damage the soil

The panels must also include an integrated system that reports water use, crop health and soil health. For wind on land up to bonitet 8, the decision requires turbines at least 200 m apart and at least 70% of the land kept for farming. These figures fix a design envelope, and they interact. Our article on sizing solar and storage covers how capacity follows from a given area.

Who approves, monitors and penalizes?

Several authorities act in sequence. The decision describes this path:

  1. DAMT certifies the bonitet of the parcel.
  2. The Ministry of Agriculture and Rural Development approves the investor's business plan, which lists the typical local crops and expected output, before the investor applies for the right to build.
  3. The Ministry of Infrastructure and Energy grants the right to build under the renewable-energy legislation. The application includes the layout plan, a technical report and the agriculture ministry's prior approval. Which authority decides may depend on capacity under the 2026 electricity law; see what to check before you build.
  4. A building permit is issued under the construction rules.

Land category changes only for an auxiliary building, if one is planned. The ground under the panels stays agricultural land.

Permanent monitoring units made up of the agriculture ministry, regional agricultural extension agencies and two inspectorates are to inspect licensed operators at least twice a year. If the business plan is not met, the units may propose a fine of 100,000 lek per dynym, or 150,000 lek per dynym for the area above 1 ha. A dynym is 1,000 square metres. A permit may be revoked for permit violations or for lack of production in three-year monitoring reports, and the operator then pays for land rehabilitation and removal.

What is the fee on the electricity, and where does it go?

Decision 387 sets the fee at 1% of the value of the energy produced. Law 9244 says the fee is paid by entities that trade energy from agrivoltaic plants and is transferred to the programme for agriculture and rural development. Under the decision, operators pay it into the state budget by the end of March of the following year, and fines go entirely to the state budget.

The decision also sets a royalty of 1% of production, in monetary value, for agrivoltaic and wind projects on land up to bonitet 8, referring to Decision 822/2015. The text does not say whether the royalty and the fee are cumulative. Treat the financial model as open until the ministry confirms. For how electricity from a small plant is compensated, see our guide to net billing for solar owners.

What was already in force, what changed in July 2026, and what is pending?

The core agrivoltaic rules have been in force since 2023 and 2024. The July 2026 law adjusted them and ordered an update.

Instrument Date What it does
Law No. 68/2023 Adopted 21 July 2023 Defines agrivoltaics, sets the bonitet classes, gives the Council of Ministers power over criteria, monitoring and fee, with a six-month deadline
Decision 387 12 June 2024 Sets criteria, approvals, monitoring, fines and the 1% fee
Law No. 69/2026 Adopted 16 July 2026; decree 29 July 2026 Adds storage to the permitted infrastructure, adds hydroponics and aquaponics, restates the Council's power in a new point 6, sets a new six-month deadline

Law 69/2026 added the word "storage" to the agrivoltaic provision and to the provision for solar and wind on bonitet 9 and 10. It did not change the bonitet classes. Parliament passed it with 77 votes, according to Reporter.al and pv magazine. It enters into force 15 days after publication in the Official Gazette, and we could not find that date.

Three things are pending as of 2 November 2026:

  • The new decision. Article 3 gives the Council of Ministers six months from entry into force to adopt a decision under the amended article. If the law entered into force in August 2026, that points to roughly February 2027. This is our estimate. We found no new decision.
  • The status of Decision 387. It cites the old clause as its basis, and the 2026 law replaced that clause without a repeal provision in the text we read. It is likely to continue until replaced, but confirm this with a lawyer.
  • Storage conditions. Decision 387 does not mention storage.

Some July 2026 reports, including pv magazine, describe the criteria, monitoring and fee as still to be set. That misses Decision 387. What is pending is the update, not the first set of rules.

What should you check before planning one?

Check the current version of each instrument before design starts, because the next decision may change numbers that your layout depends on.

  • Get the DAMT bonitet certificate for the parcel, and confirm the class.
  • Ask the Ministry of Agriculture which version of Decision 387 applies, and whether a replacement is expected.
  • Model the layout against the 60%, 40% and 3 m limits, and plan a yield record to prove the 70% condition.
  • Plan for the reporting system, since the decision requires one for water, crop and soil.
  • Treat the fee and royalty as uncertain in your cash-flow model.
  • Put regulatory-change risk in the contracts.

Frequently asked questions

Is agrivoltaics allowed on farmland in Albania?

Yes, under conditions. Law No. 68/2023 allows agrivoltaic infrastructure on agricultural land of bonitet 7 and 8, certified by the land administration directorate (DAMT), but only while agricultural production continues. Council of Ministers Decision 387 of 12 June 2024 adds detailed criteria, such as keeping at least 60% of the land for farming. Confirm current rules with the Ministry of Agriculture and a lawyer.

What soil quality (bonitet) does agrivoltaics need in Albania?

Bonitet 7 and 8, certified by DAMT. Law No. 68/2023 allows agrivoltaic infrastructure on land of bonitet 7 and 8, and wind plants on land up to bonitet 8, both only while farming continues. News reports often say 'up to 8' for both, which simplifies the text. The same law lists bonitet 9 and 10 for plain solar and wind, so check how your parcel is graded.

How much land must stay in farming under Albania's agrivoltaics rules?

At least 60% of the land. Decision 387/2024 requires 60% of the parcel to stay available for farming, caps the energy-producing module surface at 40% of the parcel, and requires modules to let at least 60% of light reach the crops. Farm output must also stay at or above 70% of the pre-installation or reference yield, based on a three-year municipal average.

What is the fee on agrivoltaic electricity in Albania?

The fee is 1% of the value of the energy produced. Decision 387/2024 sets it, and it is paid into the state budget line for supporting agriculture and rural development by the end of March of the following year. The decision also mentions a 1% royalty under Decision 822/2015. The text does not say clearly whether the two add up, so ask the authorities.

Did the July 2026 amendment change the agrivoltaics rules in Albania?

Only in part. Law No. 69/2026, adopted on 16 July 2026, added electricity storage to the infrastructure allowed under the agrivoltaic provision, added hydroponics and aquaponics, restated the Council of Ministers' power to set criteria and the fee, and set a six-month deadline for a decision. It did not change the bonitet classes. Decision 387/2024 was not repealed in the law text.

Who approves and monitors an agrivoltaic project in Albania?

Several bodies. DAMT certifies the bonitet, the Ministry of Agriculture approves the business plan, and the Ministry of Infrastructure and Energy grants the right to build under the energy rules that apply to your capacity. After construction, monitoring units of the agriculture ministry, extension agencies and inspectorates inspect at least twice a year. Fines and permit revocation are possible.

Sources

  1. Parliament of Albania: Law No. 68/2023 on some additions to Law No. 9244/2004 on the protection of agricultural land (2023)
  2. Council of Ministers of Albania: Decision No. 387 of 12 June 2024 on criteria for agrivoltaic and wind activity on agricultural land (2024)
  3. Parliament of Albania: Law No. 69/2026 on additions and amendments to Law No. 9244/2004 on the protection of agricultural land (2026)
  4. Ministry of Agriculture and Rural Development: Law No. 9244/2004 on the protection of agricultural land, updated text (2023)
  5. Ministry of Agriculture and Rural Development: Regulatory impact assessment on leasing state agricultural land (2025)
  6. Reporter.al: Parliament ignores concerns, passes law on wind parks on agricultural land (2026)
  7. pv magazine: Albanian government approves agrivoltaics (2026)

Contact

Let’s build the future, sustainably.

Whether you’re a business, municipality, or investor, we’re here to help you design and implement smarter, greener systems. Reach out to explore collaboration, partnership, or project opportunities with Greecon.

Email:
info@greecon.earth
Phone:
+355 69 444 3362
Location:
Shijak, Durrës, Albania
By sector:
energy@greecon.earth · agriculture@greecon.earth · water@greecon.earth