Articles

Thinking in systems.

How we design, connect, and automate technology that works with nature, not against it — from the engineering behind it to the legal frameworks and the clear communication that make it trustworthy.

EnergyLegal & Compliance

Do you need a licence for a battery storage system in Albania?

Storage up to 1 MW needs no licence under Albania's Law 59/2026. Above 1 MW a licence applies, and a minister approves new storage up to 5 MW.

Read article →
EnergyLegal & Compliance

What is an energy community in Albania, and who can form one?

An energy community is a locally controlled legal entity that can produce, share and sell power. The law allows it; ERE's registration rules are draft.

Read article →
EnergyLegal & Compliance

Is agrivoltaics allowed on farmland in Albania? What the law says

Yes, on bonitet 7 and 8 land while farming continues. Decision 387/2024 sets the criteria and fee; Law 69/2026 added storage and an update is due.

Read article →
EnergyLegal & Compliance

How to connect rooftop solar to the grid in Albania, step by step

Apply to the distribution operator OSSH, build within nine months, fit the meters and notify before energizing. The steps, deadlines and gaps in the rules.

Read article →
WaterLegal & Compliance

EU reclaimed water classes A to D: what the limits are

The EU sets four reclaimed water classes, A to D, for irrigation. Class A allows up to 10 E. coli per 100 ml; class D up to 10,000. Limits, crops, plans.

Read article →
EnergyLegal & Compliance

Net billing in Albania: when it starts and what changes for owners

Net billing in Albania is reported to start 1 January 2027, but the legal switch awaits an ERE price. What changes for solar owners, with an example.

Read article →
PlatformLegal & Compliance

Cybersecurity rules for energy and water: NIS2 and Albania's law

NIS2 covers medium and large energy and water operators in the EU. Albania is outside the EU but has its own law, No. 25/2024, which follows NIS2 in part.

Read article →
EnergyLegal & Compliance

Albania's energy rules are changing in 2026: what to check before you build

A new electricity law, a shift in how self-consumption is compensated, and updated farmland rules for agrivoltaics — and the questions to answer before a solar or storage project.

Read article →
PlatformLegal & Compliance

Personal data on an IoT platform: what counts, and how to handle it

Soil moisture is not personal data — until it can be linked to a person. A practical guide to data protection for connected energy, water, and farm systems.

Read article →
PlatformLegal & Compliance

Contracting for connected infrastructure: what a good agreement covers

Hardware, software, and data in one project need one clear contract. A plain-language checklist for energy, water, and agriculture systems.

Read article →
WaterLegal & Compliance

Water reuse in Albania: what to clarify before you design

Treated-water reuse touches permits, quality standards, and shared responsibility between producer and user. The questions to settle with the authorities first.

Read article →

Contact

Let’s build the future, sustainably.

Whether you’re a business, municipality, or investor, we’re here to help you design and implement smarter, greener systems. Reach out to explore collaboration, partnership, or project opportunities with Greecon.

Email:
info@greecon.earth
Phone:
+355 69 444 3362
Location:
Shijak, Durrës, Albania
By sector:
energy@greecon.earth · agriculture@greecon.earth · water@greecon.earth